Prevention
ph 612 721 2471
fx 612 721 8774
 

PREVENTION — The best way to deliver 100% good parts is by preventing the probability error. Mack Engineering utilizes many tools in the prevention process including:

• TOOL LIFE MANAGEMENT PROGRAM
• EMPLOYEE TRAINING PROGRAM
• VENDOR CERTIFICATION PROGRAM
• ROBUST PROCESS DESIGN
• MISTAKE PROOFING


© COPYRIGHT 2009 | MACK ENGINEERING CORPORATION | 3215 E. 26th. ST | MINNEAPOLIS MINNESOTA 55406 | ph 612.721.2471 | fx 612.721.8774 | EMAIL